INSTALLATION
PROCEDURE
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Move the shift lever to N.
(b) Temporarily install the park/neutral position switch assembly to the automatic transaxle case sub-assembly with the 2 bolts.
NOTICE:
Before installing the park/neutral position switch assembly, remove any dirt or rust on the manual valve lever shaft sub-assembly. Be sure to install the park/neutral position switch assembly straight along the manual valve lever shaft sub-assembly while being careful not to deform the plate spring that supports the manual valve lever shaft sub-assembly. If the plate spring is deformed, the park/neutral position switch assembly cannot be installed correctly.
(c) Install a new lock plate and the lock nut to the park/neutral position switch assembly.
Torque:
6.9 N·m {70 kgf·cm, 61 in·lbf}
(d) Temporarily install the transmission control shaft lever to the park/neutral position switch assembly.
(e) Turn the transmission control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches. |
|
(f) Remove the transmission control shaft lever from the park/neutral position switch assembly.
(g) Align the protrusion with the neutral basic line. |
|
(h) Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(i) Using a screwdriver, bend down the tabs of the lock plate.
(j) Install the transmission control shaft lever to the manual valve lever shaft sub-assembly with the nut.
Torque:
16 N·m {163 kgf·cm, 12 ft·lbf}
(k) Connect the park/neutral position switch assembly connector.
2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Connect the transmission control cable assembly to the transmission control shaft lever with the nut.
Torque:
12 N·m {122 kgf·cm, 9 ft·lbf}
NOTICE:
Before connecting the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in neutral.
3. INSTALL BATTERY
(a) Install the battery clamp bolt to the battery carrier sub-assembly.
(b) Install the battery tray and battery.
(c) Install the battery insulator.
(d) Install the battery clamp sub-assembly with the bolt and nut.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(e) Connect the cable to the positive (+) battery terminal and tighten the nut.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(f) Engage the 2 claws to close the battery terminal cap.
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
5. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
6. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION
Click here
8. INSPECT SHIFT LEVER POSITION
Click here
9. ADJUST SHIFT LEVER POSITION
Click here
Lexus RX (RX 350L, RX450h) 2016-2024 Repair Manual > Smart Access System With Push-button Start (for Entry Function): Open in Rear Floor Electrical Key Oscillator Circuit (B27A6)
DESCRIPTION The certification ECU (smart key ECU assembly) generates a request signal and transmits the signal to the No. 2 indoor electrical key antenna assembly (rear floor). For the No. 2 indoor electrical key antenna assembly (rear floor) to detect when the electrical key transmitter sub-assembl ...
Lexus RX (RX 350L, RX450h) 2016-2024 Repair Manual > Towing Converter Relay: On-vehicle Inspection
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT TOWING CONVERTER RELAY HINT: Remove interior parts so that the towing converter relay can be seen. (a) Measure the voltage according to the value(s) in the table below. Standard Voltage: Tester Connection Condition Specified Condition 1 (CTLB ...