DESCRIPTION
The main body ECU (multiplex network body ECU) controls the low beam headlights.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
Click here
PROCEDURE
1. | PERFORM ACTIVE TEST USING TECHSTREAM |
(a) Connect the Techstream to the DLC3.
(b) Turn the engine switch on (IG).
(c) Turn the Techstream on.
(d) Enter the following menus: Body Electrical / Main Body / Active Test.
(e) Perform the Active Test according to the display on the Techstream.
Body Electrical > Main Body > Active Test Tester Display | Measurement Item | Control Range | Diagnostic Note |
---|---|---|---|
Headlight Relay | Low beam headlights | OFF/ON | - |
Tester Display |
---|
Headlight Relay |
OK:
Low beam headlights illuminate.
OK | ![]() | PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE |
|
2. | INSPECT SEMICONDUCTOR POWER INTEGRATION ECU |
(a) Remove the semiconductor power integration ECU from the engine room relay block and junction block assembly.
Click here
(b) Inspect the semiconductor power integration ECU.
Click here
OK:
Semiconductor power integration ECU is normal.
NG | ![]() | REPLACE SEMICONDUCTOR POWER INTEGRATION ECU |
|
3. | CHECK HARNESS AND CONNECTOR (POWER SOURCE - SEMICONDUCTOR POWER INTEGRATION ECU) |
(a) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection | Condition | Specified Condition |
---|---|---|
B-1 (BATT) - Body ground | Always | 11 to 14 V |
NG | ![]() | REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
4. | CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY) |
(a) Disconnect the 2C instrument panel junction block assembly connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
---|---|---|
1D-8 - 2C-31 | Always | Below 1 Ω |
1D-8 or 2C-31 - Body ground | Always | 10 kΩ or higher |
NG | ![]() | REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
5. | INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY |
*a | Component without harness connected (Instrument Panel Junction Block Assembly) | - | - |
(a) Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Click here
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
---|---|---|
2C-31 - MB-15 (HRLY) | Always | Below 1 Ω |
OK | ![]() | REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) |
NG | ![]() | REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY |
Lexus RX (RX 350L, RX450h) 2016-2025 Repair Manual > Exterior Panels / Trim: Wheel Opening Moulding(for Front Side)
ComponentsCOMPONENTS ILLUSTRATION *1 FRONT FENDER MOULDING SUB-ASSEMBLY *2 FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY InstallationINSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE 1. ...
Lexus RX (RX 350L, RX450h) 2016-2025 Repair Manual > Rear Door Window Frame Moulding: Removal
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during rear door window frame moulding removal/installation are shown below. Necessary Procedures After Parts R ...