DESCRIPTION
Based on changes in the power source voltage, the main body ECU (multiplex network body ECU) can detect if the battery has been disconnected and reconnected.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
Click here
PROCEDURE
1. | CHECK HARNESS AND CONNECTOR (POWER SUPPLY) |
(a) Disconnect the 2C instrument panel junction block assembly connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection | Condition | Specified Condition |
---|---|---|
2C-1 - Body ground | Always | 8.5 V or higher |
NG | REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
2. | INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY |
(a) Remove the main body ECU (multiplex network body ECU).
Click here
*a | Component without harness connected (Instrument Panel Junction Block Assembly) | - | - |
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
---|---|---|
2C-1 - MB-31 (BECU) | Always | Below 1 Ω |
OK | REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) |
NG | REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY |